Gantt Chart
Variant: Standard
Made-up data, for demonstration only
Variants
5 types · click one to see it in the frame above- Difference from standard
- The recommended type; use it as a starting point
- Use when
- Show time spans, tasks and overlapping tasks in a project
Gantt Chart is a horizontal bar chart that shows a project schedule. Each row is one task, and the bar shows when the task starts and ends, so bar length is duration. Use it to plan and track work that runs in sequence or overlaps.
How to read a Gantt Chart
- Each row is one task. This example has 5 tasks: plan, design, build, test and launch, listed from top to bottom in order of start.
- The horizontal axis is time, in weeks, from week 1 to 12.
- Where a bar starts and how long it is give the task's time span. Plan runs from week 1 to 2, design 3 to 5, build 5 to 9, test 9 to 10 and launch in week 11.
- Bars that overlap vertically are tasks done at the same time. Design and build overlap by 1 week, and build and test also overlap by 1 week.
- The whole project uses 11 of the 12 weeks, leaving 1 week of slack at the end of the plan.
When to use it
- You want to see the whole project schedule in one picture: what starts when, what ends when, and what runs in parallel.
- The tasks have an order. One task must wait for another. Adding arrows or connector lines shows which task slipping would affect others.
- You are tracking progress. Fill in the finished part of each bar, or add a "today" line, to show whether you are on plan or behind.
When not to use it
- You want to compare numeric values, such as the budget or sales of each task. Use a Bar Chart.
- There are hundreds of tasks. So many rows cannot be read. Split the project into phases, or summarise with a Timeline of key milestones.
- You want to show events, not time spans. Use a Timeline.
- The data is a continuous trend. Use a Line Chart.
Common mistakes
1. So much detail that the rows overflow
A Gantt chart with dozens of rows cannot be read on one page. Group sub-tasks under larger headings, and show detail only for the part under way.
2. Not showing which task depends on which
Without connector lines, readers see only time spans, and cannot tell whether a delayed task will affect the next one. In the "Highlight critical path" variant, colour marks tasks chosen in advance to demonstrate the idea. The critical path has not been calculated from the links between tasks.
3. Not showing where today is
A plan with no today line makes readers count for themselves which week it is now. Try the "Today line" variant.
4. A time axis that is too coarse
An axis in months, for a project whose tasks last days, makes the bars too short to see. Set the unit to match the shortest task.
5. Planning as a still picture
A Gantt chart drawn once does not follow reality. When the plan slips, the chart must be updated. Use software that moves the bars for you, and put the update date on the chart.
Compared with similar charts
| Chart | How it differs | Choose it when |
|---|---|---|
| Gantt Chart | A bar for each task's time span | Task schedules, overlaps and progress |
| Timeline | Milestone points on a time line | Key events, not durations |
| Range Bar Chart | Bars for a range of values, not always tied to time | The lowest to highest range of each category |
| Bar Chart | Bars that start from zero | Comparing numeric values |
| Calendar Heatmap | Calendar cells coloured by value | Daily patterns |
History and development
Karol Adamiecki, a Polish engineer, developed the harmonogram approach to scheduling work from around 1896 and presented it in 1903. Henry Gantt developed a bar chart for showing time and workload in the 1910s, and the chart carries his name.


Frequently asked questions
How is a Gantt Chart different from an ordinary Bar Chart?
A Gantt chart is a kind of bar chart, but its bars do not start at zero. They start on the task's start date and run for its duration. Each row is a task. In an ordinary bar chart the bars show numeric values.
Who invented the Gantt Chart?
The name comes from Henry Gantt, who developed the chart in the 1910s. Adamiecki had the harmonogram idea for scheduling work from around 1896.
How many tasks should one chart have?
There is no fixed number. The rule is that every row should be readable on one page. If there are too many rows, group them under larger headings.
Can it show progress?
Yes. Fill in the finished part of each bar and add a today line, so readers can see whether the work is on plan. See the "Show progress" variant. For events with no duration, see the "Milestones" variant.
References
- The harmonogram · Marsh, E. R. (1975), Project Management Institute · pmi.orgUsed to confirm: Adamiecki, the harmonogram, the years 1896 and 1903, and the character of Gantt's chart
- Introduction to a Project Portfolio Management Maturity Model · Project Management Institute · pmi.orgUsed to confirm: the period when Gantt developed his chart
Last updated 28 Nov 2026