Bullet Chart
Variant: Standard
Made-up data, for demonstration only
Variants
4 types · click one to see it in the frame above- Difference from standard
- The recommended type; use it as a starting point
- Use when
- Compare actual results with a target and performance ranges
Bullet Chart is a chart that puts the actual result, a target line and rating bands on one axis. Use it to see, in a small space, whether each metric has reached its target and what level it sits at. The example uses made-up data.
How to read a Bullet Chart
- Each row's name is a metric. This example has 4, in percent.
- The orange bar is the actual result. The longer the bar, the higher the value. The actual for "On time" is 91.
- The dark tick is the target. If the bar passes the tick, the target is met. "On time" beats its target of 90, while "Satisfaction" at 78 has not reached its target of 85.
- The grey bands behind are the rating ranges, split into low, fair and good at 50 and 75. Read the bands before you decide whether a result is good.
In this example 2 of the 4 metrics reach their target: on time and quality checks passed. The other two fall short.
When to use it
- Reporting several KPIs against targets in a limited space. Each metric takes only one thin row.
- You have agreed rating levels, such as low, fair and good, so the actual result has context.
- You want to replace gauges or meters on a dashboard, which take a lot of room and give little information.
When not to use it
- You need the trend over time. Use a Line Chart.
- There is no target. Use a Bar Chart to compare values across metrics.
- You only want to show how much of a whole is done. Use a Progress Bar.
- The metrics have different units but share one axis. A shared axis means nothing. Give each row its own scale and state the unit.
Common mistakes
1. Using "high is good" bands for a "low is good" metric
Waiting time or cost does not get better as it rises. Decide which direction counts as success before you colour the bands, and say plainly whether a high or low number is good.
2. Not saying what the bar and the tick stand for
Without a key, readers may mix up the actual and the target. Add a colour key or value labels for both. See the "Add numbers" variant.
Synthetic data: hard to tell actual from target
Same data: the numbers after each bar read actual / target, e.g. 88 / 85
3. Too many bands
Use no more than 5 bands. This example uses 3. With more, the background colours fight with the bar. The "No range bands" variant shows the plain version.
4. Different scales in each row without saying so
The same length will not mean the same value. Use one scale when the unit is the same, or label the scale of each row clearly.
Compared with similar charts
| Chart | How it differs | Choose it when |
|---|---|---|
| Bullet Chart | Bar, target line and rating bands in one row | Several KPIs against targets in a small space |
| Bar Chart | Bars only | Comparing categories with no target |
| Gauge Chart | A half-circle dial | One metric you want to stress |
| KPI Card | One big number | The reader needs a single clear value |
| Progress Bar | The part done out of a full amount | Progress against 100% |
History and development
Stephen Few of Perceptual Edge, an expert in data display, designed the bullet graph to replace dashboard gauges and meters, which take a lot of room and give little information. His design specification carries a copyright date from 2006 and was last revised on 10 October 2013. The Data Visualisation Catalogue agrees that the bullet graph was developed by Few as an alternative to dashboard gauges and meters.
Frequently asked questions
Do I always need rating bands?
No. If you only have a target, use the version without bands instead of inventing levels. See the "No range bands" variant.
Is going over the target always good?
Not always. You need to know whether a higher or a lower value is better for that metric.
How is a Bullet Chart different from a Gauge?
A bullet chart uses a straight axis and stacks several metrics compactly. A gauge uses position on a dial and takes more room.
What are the parts of a Bullet Chart called?
The main bar is the featured measure. The perpendicular tick used as the target is the comparative measure. The grey bands behind are the qualitative ranges.
References
- Bullet Graph Design Specification · Stephen Few · Perceptual Edge · www.perceptualedge.comUsed to confirm: the inventor's design specification for the bullet graph
- Bullet Graph · Severino Ribecca · The Data Visualisation Catalogue · datavizcatalogue.comUsed to confirm: how to read a bullet graph and its limits
Last updated 28 Nov 2026