Variance Chart
Variant: Standard
Made-up data, for demonstration only
Variants
5 types · click one to see it in the frame above- Difference from standard
- The recommended type; use it as a starting point
- Use when
- There is a plan or budget and readers care how far over or under it you are
Variance Chart is a chart that sets actuals against plan or budget, then shows the difference as separate bars beside them, so readers see at once how much was over or under without subtracting in their heads. This example compares actuals with budget for 5 products, in millions of dollars (made-up data).
How to read a Variance Chart
- The bar is the actual and the tick mark is the plan. Home loans have an actual of $420 million, and the plan tick is at 400.
- The variance bars sit separately beside them. Their length is actual minus plan. Home loans are $20 million over plan.
- Orange is over plan and grey is under plan. Home loans (+20), personal loans (+22) and insurance (+3) are orange, while car loans (−25) and credit cards (−14) are grey.
- The number labels are at the ends of the variance bars, so you can read the value without estimating from an axis.
- Look at the whole picture before concluding. The five variances add up to +6, and the actual total of 1,354 is close to the plan total of 1,348. But inside that total, two products fall short of plan (car loans by 25 and credit cards by 14), and the total alone hides it.
The chart uses colour for "over" and "under". It does not judge good or bad. Costs over plan are bad, but sales over plan are good. Readers need to know whether a higher number is better for that measure.
When to use it
- You report actuals against a budget or plan each month or quarter, and executives want to know what is over or under.
- There are several categories where the total looks normal, but you want to find the ones that missed plan.
- You compare against last year or against a competitor. The same layout works if you swap the reference from plan to last year.
When not to use it
- There is no comparable reference value. The variance cannot be worked out. Use a Column Chart to compare values directly.
- The plan changed mid-year so that comparison is not fair. State which version of the plan you use, or compare against last year instead.
- You want to see where a cumulative difference comes from. Use a Waterfall Chart, which breaks down from a starting total to a final total.
- You want actuals against a target, with bands for good, fair and poor. Use a Bullet Chart.
Common mistakes
1. A baseline for the variance bars that is not at zero
Variance bars must start from zero. If the axis is cut, the lengths no longer match the real values and cannot be compared.
2. Different axes for the actual bars and the variance bars
The variance is a much smaller number than the actual. If it has its own axis, give the unit on every axis, and do not let the variance bars look larger than they are.
3. Using red and green by gut feeling
Colours should keep one meaning across the whole report. In this example orange means over and grey means under, which is not mixed up with judging good or bad.
4. Not saying what the plan is
Say whether it is the original budget, a revised budget or a forecast, and give the date of the plan.
5. Showing only the variance as a percentage
Car loans at −$25 million (about −4.6% of plan) and credit cards at −$14 million differ in size, so show both the amount and the percentage when the categories differ a lot in size. See the "Variance as %" variant.
Compared with similar charts
| Chart | How it differs | Choose it when |
|---|---|---|
| Variance Chart | Actual bars, plan ticks and separate variance bars | You want to know how much each category is over or under |
| Bullet Chart | Actual, target and rating bands in one row | A KPI against a target with good and poor bands |
| Waterfall Chart | Differences chained from a start total to an end total | You explain why a total changed |
| Diverging Bar | Bars going two ways from zero | You have only variances and do not need the actuals |
| Dumbbell Chart | Two dots joined together | You compare two values (such as actual and plan) per category |
History and development
IBCS describes an absolute variance as the difference in the same measure between two cases, such as actual minus plan, or actual minus previous year. It recommends that the variance bars use the same scale as the base bars when readers are meant to compare their lengths.
Frequently asked questions
How is a Variance Chart different from an ordinary comparison bar chart?
An ordinary bar chart puts two values side by side and leaves readers to subtract. A variance chart works out the difference and draws it as its own bar.
Is a positive variance always good?
No. Sales over plan are good, but costs over plan are not. Decide which direction is wanted for each measure before choosing colours.
Should I show the variance as an amount or a percentage?
Mainly as an amount, because it shows the real size. Add the percentage when comparing categories with very different bases.
References
- IBCS Standards: Absolute variances · IBCS · www.ibcs.comUsed to confirm: the formula actual minus plan and the scale of the variance bars
Last updated 28 Nov 2026