Flowchart
Scroll the chart sideways to see all of it
Made-up data, for demonstration only
Flowchart is a diagram that uses boxes for steps and arrows for their order. The example is a made-up loan application process with 5 boxes: receive the application, check whether the documents are complete, request more documents, assess credit, and tell the customer the result.
How to read a Flowchart
- Start at the rounded box. Here "Receive loan application" is the start and "Notify customer" is the end.
- A rectangle is a step. Here "Request more documents" and "Assess credit" are steps in the process.
- A diamond is a decision. Here "Documents complete?" splits two ways: "Complete" goes on to assess credit, and "Incomplete" goes to request more documents.
- Arrows are the order. Follow the arrowheads to see which step comes next.
- Follow the incomplete path. Requesting more documents loops back to receiving the application. This is a loop that repeats until the documents are complete.
- Check where each line ends. In this example the complete path reaches "Notify customer", and the incomplete path loops back to the start.
When to use it
- Explaining a process with a clear order and branches. A flowchart shows steps as boxes and their order as arrows.
- Writing a standard operating procedure (SOP) or explaining an algorithm. By definition, it shows a process or algorithm step by step.
- Getting the people involved to agree on how a process works before improving it.
When not to use it
- Several departments are involved and you must show who is responsible. Use a Swimlane Diagram, which splits lanes by owner.
- You need to talk to technical teams with exact meanings. Use a BPMN Process Map.
- You want to show decision conditions as layered rules. Use a Decision Tree.
- The process runs to dozens of steps. Split it into smaller diagrams instead of cramming it onto one page.
Common mistakes
1. Symbols that do not match their meaning
Use the diamond only for decisions, and write the condition as a question answered yes or no.
2. Decision exits with no labels
Every line leaving a diamond needs a label: yes, no, or the condition. This example labels them "Complete" and "Incomplete".
3. A box with no exit
Check that every line has a meaningful destination, and make any loop back clear.
4. Lines that cross a lot
Keep the flow in one direction (top to bottom) and use connectors when a long line would cross the picture.
5. Not saying who does which step
When several parties are involved, splitting the diagram into lanes (swimlanes) shows responsibility. A cross-functional flowchart shows where responsibility for work or a decision sits.
Compared with similar charts
| Chart | How it differs | Choose it when |
|---|---|---|
| Flowchart | The order of steps and decision points | Explaining a process in general |
| Swimlane Diagram | Adds lanes by owner | Several parties are involved |
| BPMN Process Map | Standard symbols, with events and gateways | Formal business process design |
| Decision Tree | Focuses on decision conditions | Classifying by rules |
| PERT Chart | Focuses on task order and time | Project planning |
History and development

Frank and Lillian Gilbreth published Process Charts through the American Society of Mechanical Engineers (ASME) in 1921. ISO later published ISO 5807, a standard for symbols and conventions for data, program and system flowcharts, in 1985, and confirmed it again in 2019.
Frequently asked questions
What are the standard flowchart symbols?
The main ones are direction lines, a start and end box (terminal), a rectangle for a process, and a diamond for a decision.
Is there an international standard?
ISO 5807 sets symbols and conventions for data, program and system flowcharts. It was published in 1985 and last confirmed in 2019.
How is a Flowchart different from a Swimlane?
A swimlane diagram is a flowchart divided into lanes by owner.
References
- Process Charts · Frank and Lillian Gilbreth (1921), Library of Congress scan · commons.wikimedia.orgUsed to confirm: the authors, title, year and publisher of the work
- ISO 5807:1985 Documentation symbols and conventions for flowcharts · ISO · www.iso.orgUsed to confirm: the ISO 5807 standard for flowchart symbols
Last updated 28 Nov 2026