Control Chart
SPC
Variant: Standard
Made-up data, for demonstration only
Variants
3 types · click one to see it in the frame above- Difference from standard
- The recommended type; use it as a starting point
- Use when
- Monitor a process against statistical control limits
Control Chart is a line chart that plots a process value over time, with a centre line and upper and lower control limits, to separate the natural variation of the process from special causes. This example shows daily processing time over 12 days (made-up data). The limits of 46.5 and 53.5 were set for demonstration and were not estimated from these 12 points.
How to read a Control Chart
- Each dot is one measurement, in time order. There are 12 dots, and most wander between about 49–52.
- The centre line is the reference level of the process. The upper and lower limits are calculated from data from a stable process, and the method depends on the type of chart.
- A dot inside the limits still needs to be read with the pattern. A single point within the limits does not prove the process is steady, because a run of several points can signal something unusual.
- Point 10 (54.6) is above the upper limit of 53.5. This is a signal to look for a possible cause, such as a machine fault or a change in method. The picture alone does not confirm the cause.
- Look at the pattern between the limits too. A pattern that is not random is also a signal. Try the "State the cause" variant, which labels the event.
- The limits are not a target. They have nothing to do with specifications or thresholds a customer sets.
When to use it
- You monitor a process continuously and need to know when to step in. A point outside the limits, or an unusual pattern, means you should look for an assignable cause.
- You do not want to react to ordinary swings. If a point is within the limits, fixing it point by point makes the process worse.
- Manufacturing, services or systems that are measured repeatedly every day.
When not to use it
- You do not yet have data from a stable period to set limits. Use a Run Chart for early tracking first.
- You want to compare against a target or a specification. Use a Bullet Chart or a target line.
- The data is not in time order. Use a Histogram.
- You want to show the uncertainty of a forecast. Use a Fan Chart.
Common mistakes
1. Comparing control limits with specifications
Control limits describe how the process behaves. They have no direct link to specification targets or engineering tolerances.
2. Calculating the limits from the standard deviation of all the data
Use only the standard deviation of normal variation. A general estimator pulls special causes into the calculation.
3. Treating a point outside the limits as someone's fault
It is a signal to look for a cause, not a verdict on blame.
4. Choosing the detection rules after seeing the data
The key principle is to choose the rule set before looking at the data.
5. Fixing every swing
Points inside the limits are normal variation. Reacting to every one is over-correcting.
Compared with similar charts
| Chart | How it differs | Choose it when |
|---|---|---|
| Control Chart | A centre line plus control limits | You monitor a process and check for signals |
| Run Chart | No limits, with a median line | You have little data, or are starting out |
| Line Chart | A line over time with no thresholds | You want the general trend |
| Histogram | The distribution, ignoring time | You want to see the shape of the data |
History and development
Walter Shewhart developed the control chart at Bell Labs in the 1920s to separate the variation built into a process from special causes.
Frequently asked questions
How are control limits calculated?
It depends on the type of chart and on how the process variation is estimated. Many methods use limits of about 3 sigma. This example sets 46.5 and 53.5 for demonstration.
What is the difference between special causes and common causes?
Common-cause variation is always present in the process. Special-cause variation is something new that has come in.
What does a single point beyond the limit mean?
It is a signal to investigate. For independent, normally distributed points and known three-sigma limits, the chance of a point falling outside the limits by accident is about 1 in 370. Limits estimated from data carry extra uncertainty.
References
- Control chart · Wikipedia · en.wikipedia.orgUsed to confirm: the definition and basic facts of the control chart
- Control Chart · ASQ · asq.orgUsed to confirm: the parts of the chart and signals from unusual points or patterns
- What are Control Charts? · NIST/SEMATECH · itl.nist.govUsed to confirm: the meaning of the centre line and control limits
Last updated 28 Nov 2026
In the same group
- KPI Card / Big Number
- Gauge / Speedometer
- Progress Bar
- Pareto Chart
- Run Chart
- Candlestick / OHLC
- Depth / Order Book Chart
- ROC Curve
- Confusion Matrix
- Cumulative Gains Chart
- Forest Plot
- Volcano Plot
- Ternary Plot
- Contour / Surface Plot
- 3D Scatter Plot
- Table + Conditional Formatting
- Burndown Chart
- Kaplan–Meier
- Bland–Altman Plot
- Pivot Table / Matrix
- KPI Tree / Driver Tree
- Radial Bar / Progress Ring
- Table with Sparklines
- RAG Scorecard
- Data Table