Run Chart
Variant: Standard
Made-up data, for demonstration only
Variants
4 types · click one to see it in the frame above- Difference from standard
- The recommended type; use it as a starting point
- Use when
- Track a process over time, simply
Run Chart is a chart that shows observed data in time order, usually with a horizontal line for the centre value. This example is the weekly queue waiting time over 12 weeks (made-up data), which rises from 12 to about 18–19.
How to read a Run Chart
- The points run week by week. In this example week 1 is 12 and week 12 is 18.
- The horizontal line is the median. A central value is usually shown as a horizontal reference line. Here the median of the 12 values is 15.5.
- Look for long stretches of points above or below the line. Look for points that stay on one side of the median in a row. In this example weeks 8 to 12 are above the line, 5 points, which is short of the 6 points in a row that the shift rule used by IHI needs.
- Look for a continuing rise or fall. Here the values rise overall, although week 9 dips slightly.
- Look for outliers. Unusual points are easy to see in this kind of chart.
- Try the "Mark the level shift" and "Note the event" variants to see which event came before the change.
When to use it
- You want a quick look at whether a process has changed. It is like a control chart but easier to make, because it shows no limits.
- You have little data, not yet enough to compute control limits.
- You are tracking the effect of an improvement, to see whether the level moved after a change in method.
When not to use it
- You need a formal separation of normal variation from special causes. A run chart does not support analysis techniques as fully as a control chart. Use a Control Chart.
- You want to compare with a target. Add a target line (see the "With target line" variant) or use a Bullet Chart.
- The data are not in time order. Use a Histogram.
Common mistakes
1. Using the mean instead of the median without saying so
The mean is pulled by outliers. Say clearly what the centre line is.
2. Reading one point as a trend
Look at several points in a row, not a single point that goes up or down.
3. Not labelling events
If there was a change of shift, system or policy, label it so readers can link it to the change in the values.
4. Truncating the vertical axis so the change looks bigger than it is
Choose the axis range with care and give the unit.
5. Concluding firmly from too few points
Little data makes a continuing pattern hard to read. Collect more data before you conclude.
Compared with similar charts
| Chart | How it differs | Choose it when |
|---|---|---|
| Run Chart | A line over time plus the median | A fast look for change, with little data |
| Control Chart | Has control limits | Formal checks for signals |
| Line Chart | A line over time with no reference line | General trends |
| Sparklines | Small lines in a table | Seeing trends for many items |
Frequently asked questions
How is a run chart different from a control chart?
They are similar, but a run chart shows no control limits, so it is easier to make but cannot be analysed as fully.
Should I use the median or the mean?
You can show either. This example uses the median.
What is another name for a run chart?
Run-sequence plot.
References
- Run chart · Wikipedia · en.wikipedia.orgUsed to confirm: the definition and basic facts about the run chart
- Control chart · Wikipedia · en.wikipedia.orgUsed to confirm: the definition and basic facts about the control chart
- Run Chart guidance · Institute for Healthcare Improvement · ihi.orgUsed to confirm: the median line and the shift rule that uses 6 points in a row
Last updated 28 Nov 2026
In the same group
- KPI Card / Big Number
- Gauge / Speedometer
- Progress Bar
- Pareto Chart
- Control Chart
- Candlestick / OHLC
- Depth / Order Book Chart
- ROC Curve
- Confusion Matrix
- Cumulative Gains Chart
- Forest Plot
- Volcano Plot
- Ternary Plot
- Contour / Surface Plot
- 3D Scatter Plot
- Table + Conditional Formatting
- Burndown Chart
- Kaplan–Meier
- Bland–Altman Plot
- Pivot Table / Matrix
- KPI Tree / Driver Tree
- Radial Bar / Progress Ring
- Table with Sparklines
- RAG Scorecard
- Data Table